Update: Seismic Boring Study on Wilshire Blvd.

Summary

The seismic boring study in the City of Beverly Hills for Section 2 of the Purple Line Extension Project continues throughout the month of June. The seismic boring study is being conducted to determine the limits of the fault line within the tunneling path. The borings will identify the subsurface conditions, including fault characteristics relative to the proposed Metro tunnels, and provide vital information for the design of the project.

Work will occur from 9am to 4pm and 8pm to 6am on the dates. Click “Detours & Additional Information” for the latest schedule, worksite and traffic plans.


For more information please click here